No. S 436
Road Traffic Act
(Chapter 276)
Road Traffic (Expressway Traffic) (Amendment No. 2) Rules 1996
In exercise of the powers conferred by sections 114 and 140 of the Road Traffic Act, the Minister for Home Affairs hereby makes the following Rules:
1.  These Rules may be cited as the Road Traffic (Expressway Traffic) (Amendment No. 2) Rules 1996 and shall come into operation on 27th September 1996.
2.  The Second Schedule to the Road Traffic (Expressway Traffic) Rules is amended by deleting paragraph 6 and substituting the following paragraph:
6.  That length of the Expressway known as Tampines Expressway (referred to in this Schedule as TPE) which extends from its intersection with Upper Changi Road North in a general north westward direction past the —
(a)TPE/Tampines Avenue 7 Interchange;
(b)TPE/Tampines Avenue 12 Interchange;
(c)TPE/Tampines Road Interchange;
(d)TPE/Punggol Road Interchange;
(e)TPE/Jalan Kayu Interchange,
to its interchange with the Seletar Expressway, a distance of approximately 14,400 metres.
[R 23.]
[G.N. Nos.]
[S 514/93]
[S 134/95]
[S 191/96”.]

Made this 17th day of September 1996.

PETER CHAN JER HING
Permanent Secretary,
Ministry of Home Affairs,
Singapore.
[TP 5.2.8; MHA(PS) 112/2/046; AG/SL/14/95/8]
(To be presented to Parliament under section 141 of the Road Traffic Act).