Public Utilities (Electricity) Regulations 1997
Table of Contents
Enacting Formula
Part I PRELIMINARY
1 Citation and commencement
2 Definitions
Part II ELECTRICAL INSTALLATIONS
3 Person responsible for electrical installation
4 All apparatus, etc., to be of requisite standards
5 Cable with aluminium conductors not to be used in domestic electrical installation
6 Cable for concealed wiring in an installation
7 Board may require use of high-sensitivity earth leakage circuit breaker
8 Switchboard
9 High voltage switchboard
10 Adequate lighting where apparatus installed
11 Use of auto-transformers
12 Instructions for treatment of electric shock
13 Decorative lighting installation
14 Supply installation to be operated and used safely
Part III WORK ON HIGH VOLTAGE APPARATUS
15 Definitions of this Part
16 Work to be carried out by authorised high voltage switching engineer or by competent person
17 Duties of authorised high voltage switching engineer before commencement of work
18 Duties of authorised high voltage switching engineer upon completion of work
19 Where apparatus connected to source of supply of electricity outside control of authorised high voltage switching engineer
Part IV PRESCRIBED ARTICLES
20 Definitions of this Part
21 Power to prescribe classes of electrical appliances, etc.
22 Application for approval to sell or hire out prescribed article
23 Certificate of approval
24 Fee not refundable
25 Modification subject to approval
26 Batch-testing
27 Certificate of approval not transferable
28 Replacement of certificate of approval
29 Cancellation, etc., of certificate of approval
30 Cancelled certificate of approval to be returned to Board
31 Registers
32 Submission of apparatus, etc., for test
33 Prohibition on use or sale of apparatus
34 Flexible cord used for connection to appliances to comply with International Colour Code
Part V MISCELLANEOUS
35 Penalty
36 Revocation and transitional provisions