Land Surveyors (Conduct of Title Surveys) Rules
Table of Contents
1 Citation
2 Surveyor to be familiar with related legislation
3 Personal direction and supervision of surveys
4 Existing survey data to be obtained
5 Notice of intention to commence a title survey
6 Compliance with requirements of Survey Department, Land Office, etc.
7 Deposit of field notes, etc.
8 Compliance with directions of Chief Surveyor
9 Errors in previous surveys
10 General field practice
11 Standard pattern of field books, etc.
12 Field equipment
13 Boundaries
14 Meridian of reference and origin of co-ordinates
15 Astronomical observations for azimuth
16 Datum and closing of traverses
17 Survey and marking of boundaries
18 Topographical details
19 Strata surveys
20 Observations to trigonometrical stations
21 Road and access reserves
22 Boundary marks to conform to standard patterns
23 Emplacement prior to survey
24 Stability of marks
25 Authorised marks
26 Specimen field book pages
27 Original field notes to be submitted
28 Certificate to be signed
29 Entries to be made in permanent ink
30 Cancellation of incorrect entries
30 Reobservation and remeasurement of incorrect entries
31 Chain and electronic distance measuring equipment test results
32 Diagrams
33 Representation of boundary lines, etc.
34 Indication of datum
35 Numbering of stations
36 Abbreviations, symbols and conventional signs in field notes
37 Classification of surveys
38 Closing errors
39 Angular observations
40 Linear measurements with steel tapes
41 Reduction of linear measurement by steel tapes
42 Linear measurements with electronic distance measuring equipment
43 Correction to and adjustment of bearings
44 Purpose of computations
45 Required computations
46 Units of measurement
47 Calculated and scaled areas
48 Plan forms
49 Permanence of information on plans
50 Plotting on plans
51 Plan scales
52 Cancellation of incorrect entries
53 Representation of boundary lines, etc.
54 Plan headings
55 Plan serial numbers
56 Numerical data
57 Other information
58 Plan Schedule
59 Additional information
60 Signatures on plans
61 Certification of plans
FIRST SCHEDULE
SECOND SCHEDULE
THIRD SCHEDULE
FOURTH SCHEDULE
FIFTH SCHEDULE
SIXTH SCHEDULE Units of Measurement
Legislative History