NUMBER OF PASSENGERS
MEASUREMENT OF PASSENGER SPACES
SPACES WHICH ARE NOT TO BE MEASURED, ETC.
VENTILATION
LIGHTING
DOORS AND BOOBY HATCHES
STAIRWAYS
WATER CLOSETS
WASHING PLACES
FUEL, WATER AND PROVISIONS
HOSPITAL ACCOMMODATION FOR UNBERTHED AND THIRD CLASS BERTHED PASSENGERS
GALLEYS
GOODS ON PASSENGER DECKS
DEPARTURE OF PASSENGER SHIPS
STANDARD TEST-PIECES
GENERAL REQUIREMENTS FOR BOILER STEEL
BOILER PLATES
ANGLE, RIVET AND STAY BARS
WROUGHT IRON FOR COMBUSTION CHAMBER STAYS
BOILER TUBES
STEEL FORGINGS
STEEL CASTINGS
MALLEABLE CAST-IRON
ORDINARY CAST-IRON
SOLID-DRAWN STEEL STEAM AND FEED PIPES
LAP WELDED STEEL STEAM PIPES
LAP WELDED IRON STEAM PIPES
ANNEALING OF IRON AND STEEL PIPES
SOLID DRAWN AIR BOTTLES
SPECIAL MATERIAL AND MATERIAL MANUFACTURED ABROAD
SURVEY
| Tests for welds |
| 91. The seams shall be welded by hammering the joint. To ensure that the process of welding is satisfactory the scrap ends, or two rings, cut from the scrap ends of each tube welded shall be closed in to one-half the internal diameter of the pipe without fracture of the weld when on the major and minor axis of the closed-in rings respectively. |