Rapid Transit Systems Act |
Rapid Transit Systems (Creation of Rights) (No. 7) Notification 2012 |
|
Citation |
1. This Notification may be cited as the Rapid Transit Systems (Creation of Rights) (No. 7) Notification 2012. |
Powers of Authority |
2. The Authority or any person authorised by the Authority may, at any reasonable time and for the purposes of and incidental to the operation of the railway known as the East-West Line for Tanjong Pagar MRT Station, enter upon the railway areas in the land described as TS 03 Lot 00876K pt (referred to in this Notification as the specified land) and exercise such rights as are described in the Schedule in, under or over the area of the specified land. |
Inspection of plan |
3. A copy of the plan of the railway areas in the specified land shall be available for inspection by the public free of charge at the office of the Land Transport Authority of Singapore at 1 Hampshire Road, Singapore 219428 —
|
Chairman, Land Transport Authority of Singapore. |
[LTA/KKC/EW/RTSA-L18.030.002.S6.07; AG/LLRD/SL/263A/2010/2 Vol. 3] |