FIRST SCHEDULE
Regulation 4
Equipment* for which no station licence is required
for in-building or localised on-site operations
*   Other low power equipment that operate in frequency bands other than those listed, but which meet the output power limits specified for the same type of equipment may be exempted from licensing as long as both the output power limits and the frequency bands are approved by the Telecommunication Authority of Singapore.

[S 144/1996 wef 01/04/1996]