2. Item (9) in the Schedule to the Protected Places (Consolidation) Order (O 4) is amended —(a) | by deleting paragraph 2 and the plan for PSA CORPORATION LIMITED (MULTI-PURPOSE TERMINAL); | (b) | by deleting the words “Director (Corporate Development), PSA Corporation Limited” in the first column of paragraphs 3 and 5 and substituting in each case the words “Senior Terminals Security Manager, PSA Corporation Limited”; | (c) | by deleting paragraph 4 and the plan and substituting the following paragraph and plan:“Senior Terminals Security Manager, PSA Corporation Limited |
| 4. | PSA CORPORATION LIMITED (BRANI TERMINAL). |
|
| All that area occupied by “PSA CORPORATION LIMITED (BRANI TERMINAL) — PROTECTED PLACE” containing an area of approximately 861,550 square metres and bounded by Keppel Channel and Selat Sengkir. |
| The boundary commences at the north-westernmost corner of the aforesaid “PSA CORPORATION LIMITED (BRANI TERMINAL) — PROTECTED PLACE” which point’s co-ordinates are North 27,282.754 metres and East 26,954.037 metres of the Singapore Land Authority SVY 21 Datum and runs approximately as follows: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | to the point of commencement and are delineated in the Plan set out below. |
|
| | |
|
| (d) | by deleting paragraph 6 and the plan and substituting the following paragraph and plan: “Senior Terminals Security Manager, PSA Corporation Limited |
| 6. | PSA CORPORATION LIMITED (PASIR PANJANG TERMINAL). |
|
| All that area occupied by “PSA CORPORATION LIMITED (PASIR PANJANG TERMINAL) — PROTECTED PLACE” containing an area of approximately 3,437,333 square metres and bounded by West Coast Ferry Road, Harbour Drive and East Jurong Fairway. |
| The boundary commences at the north-west corner of the aforesaid “PSA CORPORATION LIMITED (PASIR PANJANG TERMINAL) — PROTECTED PLACE” which point’s co-ordinates are North 30,310.960 metres and East 19,958.452 metres of the Singapore Land Authority SVY 21 Datum and runs approximately as follows: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | to the point of commencement and are delineated in the Plan set out below. |
|
| | |
|
| (e) | by deleting paragraph 7 and the plan for PSA CORPORATION LIMITED (PASIR PANJANG LIGHTER WHARVES AT PASIR PANJANG WHARVES DRIVE 4). |
|