6. The First Schedule to the principal Rules is amended —(a) | by deleting items 1 to 6 and substituting the following items:“ 1.—(1) Subject to paragraph (2), fee for an application for planning permission or conservation permission under section 13 of the Act to develop land if the development is for the erection of a new building or buildings for a land extensive development — |
| | | (a) | for the first 1,000 square metres of the development area or part thereof |
|
| | | (b) | for every subsequent 1,000 square metres of the development area or part thereof |
|
| | | (2) Paragraph (1) does not apply to an application in relation to the erection of a new building or buildings on land that was approved in a planning permission or conservation permission granted at any time before the application, to be used as a land extensive development |
| | | (3) Where an application mentioned in paragraph (1) includes works carried out on one or more conserved buildings located within any conservation area other than a historic conservation area, no additional fee is payable for the application in respect of the works on the conserved building or buildings |
| | | (4) Where an application mentioned in paragraph (1) includes additions and alterations to a monument or works for the preservation of a monument, no additional fee is payable for the application in respect of the additions and alterations to the monument or works for the preservation of the monument |
| | | | | | 2.—(1) Fee for an application for planning permission or conservation permission under section 13 of the Act to develop land if the development is for the erection of a new building or buildings for a land intensive development or which form part of a land intensive development, or on land that was approved, in a planning permission or conservation permission granted at any time before the application, to be used as a land extensive development — |
| | | (a) | for the first 1,000 square metres of floor area of the proposed development or part thereof |
|
| | | (b) | for every additional 100 square metres of floor area of the proposed development or part thereof beyond the first 1,000 square metres, where the proposed use for the new building or buildings and, where applicable, the approved use of the existing building or buildings to be retained for the land intensive development is or are permissible under — |
|
| | | (i) | Broad Land‑Use Group A |
|
| | | (ii) | Broad Land‑Use Group B |
|
| | | (2) Where an application mentioned in paragraph (1) includes works carried out on one or more conserved buildings located within any conservation area other than a historic conservation area, no additional fee is payable for the application in respect of the works on the conserved building or buildings |
| | | (3) Where an application mentioned in paragraph (1) includes additions and alterations to a monument or works for the preservation of a monument, no additional fee is payable for the application in respect of the additions and alterations to the monument or works for the preservation of the monument |
| | | (4) For the purposes of paragraph (1)(b), where — |
| | | (a) | the proposed or approved use, as the case may be, of the building or buildings is permissible under the mixed-use zoning “White”, “Residential/Institution” or “Commercial/Institution”; |
|
| | | (b) | one or more of the uses is a use within Broad Land‑Use Group B (called in this paragraph a Group B use); and |
|
| | | (c) | the total floor area for any Group B use is not less than 80% of the total floor area for the development on the land, |
|
| | | the fee specified in paragraph (1)(b)(ii) applies |
| | | | | | 3. Fee for an application for planning permission or conservation permission under section 13 of the Act to develop land if the development is for the erection of a new landed dwelling‑house or landed dwelling‑houses — |
| | | (a) | where the development is outside a good class bungalow area |
|
| | $6,420 (for each landed dwelling‑house) |
| (b) | where the development is within a good class bungalow area |
|
| | $8,560 (for each landed dwelling‑house) |
| | | | 4. Fee for an application for an amendment to approved plans of an application mentioned in — |
| | | | | | | | $3,745, subject to an additional $642 for each storey of a building in respect of which amendments are proposed |
| (c) | item 3(a) or (b), where the amendment — |
|
| | | (i) | affects one or more landed dwelling‑house or landed dwelling‑houses and the plot or plots for the landed dwelling‑house or landed dwelling‑houses |
|
| | $3,210 (for each landed dwelling‑house and its plot) |
| (ii) | does not affect any landed dwelling‑house and its plot |
|
| | | | | | 5.—(1) Fee for an application for planning permission or conservation permission under section 13 of the Act to develop land, if the development is for additions and alterations to — |
| | | (a) | any existing landed dwelling‑house |
|
| | $3,210 (for each landed dwelling‑house) |
| (b) | one existing strata landed dwelling‑house only |
|
| | | (c) | one strata subdivided residential unit in a condominium or residential flats development |
|
| | | (d) | other types of existing buildings (including 2 or more strata landed dwelling‑houses) |
|
| | $3,745, subject to an additional $642 for each storey of a building in respect of which additions and alterations are proposed |
| (2) Paragraph (1) does not apply to any conserved building located within a historic conservation area |
| | | | | | 6. Fee for an application for an amendment to approved plans of an application mentioned in item 5 for additions and alterations to — |
| | | (a) | any existing landed dwelling‑house |
|
| | $3,210 (for each landed dwelling‑house) |
| (b) | one existing strata landed dwelling‑house only |
|
| | | (c) | one strata subdivided residential unit in a condominium or residential flats development |
|
| | | (d) | other types of existing buildings (including 2 or more strata landed dwelling‑houses) |
|
| | $3,745, subject to an additional $642 for each storey of a building in respect of which additions and alterations are proposed |
|
”; |
|
| (b) | by deleting the words “plans submitted for approval or earlier approved” in the first column of item 8 and substituting the words “approved plans”; | (c) | by deleting the words “(excluding any application for conservation permission to erect signages referred to in item 18)” in the first column of item 9; | (d) | by inserting, immediately after the words “the works are” in the first column of item 9(1)(a), the words “to be”; | (e) | by deleting “$2,675” in the second column of item 9(1)(a)(i) and substituting “$3,745”; | (f) | by deleting “$4,815” in the second column of item 9(1)(a)(ii) and substituting “$6,955”; | (g) | by deleting the words “$4,815 plus $1,605” in the second column of item 9(1)(a)(iii) and substituting the words “$6,955 plus $2,675”; | (h) | by inserting, immediately after the words “the works are” in the first column of item 9(1)(b), the words “to be”; | (i) | by deleting “$1,605” in the second column of item 9(1)(b)(i) and substituting “$2,140”; | (j) | by deleting “$2,675” in the second column of item 9(1)(b)(ii) and substituting “$3,745”; | (k) | by deleting the words “$2,675 plus $535” in the second column of item 9(1)(b)(iii) and substituting the words “$3,745 plus $1,070”; | (l) | by deleting paragraph (1) of item 10 and substituting the following paragraph:“(1) Fee for an application for amendment to approved plans under an application mentioned in item 9 — |
| | | (a) | where the subject matter of the amendment includes Category 1 Works to be carried out on at least one conserved building, and the amendment relates to works on — |
|
| | | (i) | only one conserved building |
|
| | | (ii) | only 2 conserved buildings |
|
| | | (iii) | more than 2 conserved buildings |
|
| | $6,955 plus $2,675 per conserved building for the third and each subsequent conserved building |
| (b) | where the subject matter of the amendment does not include any Category 1 Works but includes Category 2 Works to be carried out on at least one conserved building, and the amendment relates to works on — |
|
| | | (i) | only one conserved building |
|
| | | (ii) | only 2 conserved buildings |
|
| | | (iii) | more than 2 conserved buildings |
|
| | $3,745 plus $1,070 per conserved building for the third and each subsequent conserved building |
|
”; |
|
| (m) | by deleting the words “(excluding any application for conservation permission to erect signages referred to in item 18)” in the first column of item 11(1); | (n) | by deleting “$1,605” in the second column of item 11(1)(a) and substituting “$2,140”; | (o) | by deleting “$2,675” in the second column of item 11(1)(b) and substituting “$3,745”; | (p) | by deleting the words “$2,675 plus $535” in the second column of item 11(1)(c) and substituting the words “$3,745 plus $1,070”; | (q) | by deleting items 12 to 14 and substituting the following items:“ 12. Fee for an application for amendment to approved plans under an application mentioned in item 11, where the amendment relates to works on — |
| | | | | | | | | (c) | more than 2 strata units |
|
| | $3,745 plus $1,070 per strata unit for the third and each subsequent strata unit |
| | | | 13. Fee for an application for subdivision permission under section 13 of the Act to subdivide — |
| | | | | | | | | | | | | | | 14. Fee for an application for amendment to approved plans to subdivide — |
| | | | | | | | | | | |
”; |
|
| (r) | by deleting “$321” in the second column of item 15(a) and substituting “$535”; | (s) | by deleting “$160.50” in the second column of item 15(b) and substituting “$535”; | (t) | by deleting “$107” in the second column of item 17 and substituting “$160.50”; | (u) | by deleting item 18; | (v) | by deleting “$1,070” in the second column of item 19 and substituting “$2,140”; | (w) | by deleting item 21 and substituting the following item:“ 21.—(1) Fee for the first or second application to extend the validity period of — |
| | | (a) | a conservation permission granted under section 14 of the Act to carry out works to an existing building or buildings within a conservation area for the conservation of the building or buildings |
|
| | | (b) | a written permission granted under section 14 of the Act for a purpose other than that mentioned in sub‑paragraph (a) |
|
| | | (c) | a provisional permission granted under section 17 of the Act |
|
| | | (2) Fee for the third and subsequent applications to extend the validity period of any permission mentioned in paragraph (1) |
| | $1,605 for the third application and additional increments of $1,070 for each subsequent application |
| (3) Fee for an application to extend the validity period of an outline permission granted under section 18 of the Act |
| | |
”; |
|
| (x) | by deleting “$3,210” in the second column of item 22 and substituting “$4,815”; | (y) | by deleting “$1,070” in the second column of item 26(a) and substituting “$1,000”; | (z) | by deleting “$2,140” in the second column of item 26(b) and substituting “$2,000”; | (za) | by deleting “$3,210” in the second column of item 26(c) and substituting “$3,000”; | (zb) | by deleting “$4,280” in the second column of item 26(d) and substituting “$4,000”; | (zc) | by deleting “$5,350” in the second column of item 26(e) and substituting “$5,000”; | (zd) | by deleting “$856” in the second column of item 41(a) and substituting “$1,284”; | (ze) | by deleting “$642” in the second column of item 41(b) and substituting “$909.50”; and | (zf) | by deleting “$535” in the second column of item 44 and substituting “$1,070”. |
|