No. S 728
Rapid Transit Systems Act
(CHAPTER 263A)
Rapid Transit Systems
(Creation of Rights) (No. 9)
Notification 2017
In exercise of the powers conferred by section 6 of the Rapid Transit Systems Act, the Land Transport Authority of Singapore makes the following Notification:
Citation
1.  This Notification is the Rapid Transit Systems (Creation of Rights) (No. 9) Notification 2017.
Powers of Authority
2.  The Authority or any person authorised by the Authority may, at any reasonable time and for the purposes of and incidental to the operation of the railway known as North‑East Line for Woodleigh MRT Station, enter upon the railway area in the land described as MK 24 Lot 10889K pt (called in this Notification the specified land) and exercise such rights as are described in the Schedule in, under or over the railway area in the specified land.
Inspection of plan
3.  A copy of the plan of the railway area in the specified land is available for inspection by the public free of charge at the office of the Land Transport Authority of Singapore at 1 Hampshire Road, Singapore 219428 —
(a)between 9 a.m. and 5 p.m. of any day from Monday to Friday (except public holidays); but
(b)if any such day is the eve of the New Year, Lunar New Year or Christmas, between 9 a.m. and 12 noon.
Made on 13 December 2017.
CHAN HENG LOON ALAN
Chairman,
Land Transport Authority of Singapore.
[LTA/JL/DT/RTSA/S6/L18.030.002.10/2017; AG/LEGIS/SL/263A/2015/2 Vol. 2]