Building Control Act |
Building Control (Buildability and Productivity) Regulations 2011 |
|
Citation and commencement |
1. These Regulations may be cited as the Building Control (Buildability and Productivity) Regulations 2011 and shall come into operation 15th July 2011. [S 729/2014 wef 01/11/2014] |
Definitions |
2. In these Regulations —
|
Application |
Minimum buildable design score |
4.—(1) Every qualified person appointed under section 8(1)(a) or 11(1)(d)(i) of the Act and every developer, in respect of any relevant building works, shall ensure that the building works are designed and carried out such that the buildable design score of the building works is not less than the minimum buildable design score referred to in paragraph (2) or (3), as the case may be.
|
Mandatory buildable systems and standard components |
4A. Every qualified person appointed under section 8(1)(a) or 11(1)(d)(i) of the Act and every developer, in respect of any relevant building works, shall ensure that the building works are designed and carried out such that the building implements or incorporates the building systems and standard components applicable to the category of building use specified in the Second Schedule which applies to that building. [S 729/2014 wef 01/11/2014] |
Minimum productivity requirements |
4B.—(1) Every qualified person appointed under section 8(1)(a) or 11(1)(d)(i) of the Act and every developer, in respect of any relevant building works referred to in paragraph (2), (3) or (3A), shall ensure that the building works are designed and carried out such that the building works satisfy the requirements referred to in paragraph (2), (3), (3A) or (4), as the case may be. [S 125/2017 wef 01/04/2017]
|
Minimum constructability score |
5. Every builder appointed under section 8(1)(c) of the Act, in respect of any relevant building works, shall ensure that construction of the building works, including those carried out on any land which is sold on or after 15 October 2013 but before 1 November 2014 under the Government Land Sales Programme, is not less than the applicable minimum constructability score for the relevant gross floor area of the building works relating to any building as set out in the Code of Practice. [S 522/2013 wef 01/09/2013] [S 729/2014 wef 01/11/2014] |
Submission of buildability detailed design and implementation plan for approval |
5A.—(1) For the purposes of section 5(1) of the Act, the plans of building works for which an application for approval is to be made to the Commissioner of Building Control shall include the buildability detailed design and implementation plan.
|
Submission of buildable design score |
6. Every developer shall, at the time of application for approval of building plans under section 5(1) of the Act, submit the following documents to the Commissioner of Building Control:
|
Submission of structural buildable design score |
7. In addition to the requirements under regulation 6, if an application for approval of the detailed structural plans of any proposed building works under section 5(1) of the Act is made before an application for approval of the building plans, then the person making the application shall, at the time the application for approval of the detailed structural plans of the building works is made, submit the following documents to the Commissioner of Building Control:
|
Submission of constructability score |
8.—(1) Every builder referred to in regulation 5 shall submit the constructability score to the Commissioner of Building Control at the time of application for permit to carry out structural works under section 6(1) of the Act or within such time after the grant of the permit as the Commissioner of Building Control may, in his discretion, allow.
|
Site records of construction techniques and processes |
9.—(1) Every builder referred to in regulation 5 shall keep and maintain the following at the premises on which the building works are carried out:
|
Collection and submission of Construction Productivity Data |
10. Every builder referred to in regulation 5 shall —
|
Departure and deviation from approved plans |
11.—(1) Notwithstanding regulation 18 of the Building Control Regulations 2003 (G.N. No S 666/2003), any person who wishes to make any change to the approved buildability detailed design and implementation plan of any building works, or to the approved plan of the building works, which affects the buildable design score, shall apply to the Commissioner of Building Control under section 5A(1) of the Act.
|
Departure and deviation from adopted construction techniques and processes |
12. Every builder referred to in regulation 5 who wishes to depart or deviate from any construction technique or process adopted for the purpose of computing the constructability score referred to in regulation 8 shall —
|
Submission of record plans of buildable design score |
13.—(1) On completion of the building works, the developer shall submit the buildable design score of the building works as completed (referred to in this regulation as the record plans of buildable design score) to the Commissioner of Building Control at the following time:
|
Submission of certificate of compliance of constructability score |
14.—(1) On completion of the building works, the developer shall submit a certificate in such form as may be required by the Commissioner of Building Control (referred to in this regulation as the certificate of compliance of constructability score) to the Commissioner of Building Control at the following time:
|
Penalty |
15. Any person who contravenes regulation 4, 4A, 4B, 5, 8, 9, 10, 11, 12, 13 or 14 shall be guilty of an offence and shall be liable on conviction to a fine not exceeding $10,000. [S 729/2014 wef 01/11/2014] |
Revocation |
16. The Building Control (Buildable Design) Regulations (Cap. 29, Rg 8) are revoked. |
Savings and transitional provision |
17. Notwithstanding regulation 16, the revoked Building Control (Buildable Design) Regulations in force immediately before 15th July 2011 shall continue to apply to building works, in respect of which an application for planning permission under the Planning Act (Cap. 232) has been submitted to the competent authority before 15th July 2011. |
Permanent Secretary, Ministry of National Development, Singapore. |
[ND202/1-7 Vol. 18; AG/LLRD/SL/29/2011/1 Vol. 1] |
(To be presented to Parliament under section 52 of the Building Control Act). |