Electric Vehicles Charging Act 2022 |
Electric Vehicles Charging (Minimum Electrical Load and Charging Points) Order 2023 |
|
Citation and commencement |
1. This Order is the Electric Vehicles Charging (Minimum Electrical Load and Charging Points) Order 2023 and comes into operation on 8 December 2023. |
Definitions |
2. In this Order, “building works”, “development”, “electrical work”, “parking lot” and “parking place” have the meanings given by section 60 of the Act. |
Minimum electrical load and charging points for development with building works |
Minimum electrical load and charging points for development with electrical work |
4.—(1) For the purpose of section 65(1)(a) of the Act, the minimum electrical load in respect of a development on which electrical work is carried out is determined in accordance with the formula 1.3 kVA × TPL, where TPL is the total number of parking lots in the parking places of the development.
|
Permanent Secretary, Ministry of Transport, Singapore. |
[MOT.LT.271.0.015.0.1; AG/LEGIS/SL/89B/2020/7 Vol. 1] |
(To be presented to Parliament under section 96 of the Electric Vehicles Charging Act 2022). |