Pre-treatment plant, monitoring and control devices, etc.
5.—(1)  Any person who discharges trade effluent into any sewerage system shall, in connection with such discharge, install such sampling test points, inspection chambers, measuring devices, and recording and other apparatuses as the Board may require.
(2)  Any person who discharges trade effluent into any sewerage system shall install a pre-treatment plant if the Board so requires and shall —
(a)use or operate the plant to treat trade effluent before discharging the trade effluent into the sewerage system; and
(b)maintain the plant in an efficient condition at all times.
Informal Consolidation | Amended S 546/2024
Pre-treatment plant, monitoring and control devices, etc.
5.—(1)  Any person who discharges trade effluent into any sewerage system shall, in connection with such discharge, install such sampling test points, inspection chambers, measuring devices, and recording and other apparatuses as the Board may require.
(2)  Any person who discharges trade effluent into any sewerage system shall install a pre-treatment plant if the Board so requires and shall —
(a)use or operate the plant to treat trade effluent before discharging the trade effluent into the sewerage system; and
(b)maintain the plant in an efficient condition at all times.
(3)  A person must not tamper with —
(a)any sampling test point, inspection chamber, measuring device, or recording and other apparatus installed (whether or not by the person) for the purpose of sampling, inspecting, measuring or recording any trade effluent discharged into any sewerage system; or
(b)any pre-treatment plant installed (whether or not by the person) for the purpose of treating any trade effluent discharged into any sewerage system.
[S 546/2024 wef 01/07/2024]