4. The Schedule to the principal Regulations is deleted and the following Schedule substituted therefor: | | |
---|
| | |
---|
| For a permit under regulation 9(1) to camp in any national park, nature reserve or public park |
| | | | For a permit under regulation 9(2) to hold a barbeque at — |
| | | | | | | | | | (i) | $16 per single pit per day |
|
(ii) | $20 per double pit per day |
|
| | | | | | | | | | | | | | | | | | | | | | For a permit under regulation 13(2) to store a boat in any national park, nature reserve or public park — |
| | | | | | | | | | | | For an application under section 32 of the Act (for the Commissioner’s approval for the purposes of section 24, 26, 30 or 31 of the Act) made for the first time at the development control submission stage, for — |
| | | | (a) | works in a tree conservation area or on vacant land relating to — |
|
| | | | | | | | | | | | a detached house or bungalow (other than a good class bungalow), semi-detached house or terrace house |
| | | | | | landed housing with provision for an open space (to be vested as a public park under section 29 of the Act) |
| | | | | | strata landed housing or cluster housing |
| | | | | | | | | | | | a condominium development |
| | | | | | a commercial development other than one referred to in sub-paragraph (viii) or (ix) |
| | | | | | a hotel, boarding house, guest house, serviced apartment, students’ hostel or workers’ dormitory |
| | | | | | an industrial development, a warehouse, utilities, telecommunication or business park development, a warehouse retail building or an industrial retail building |
| | | | | | | | | | | | a civic and community institution or an educational institution |
| | | | | | a hospital, petrol station or golf course |
| | | | | | a rapid transit system depot, bus depot or bus interchange |
| | | | | | | | | | | | a project other than one referred to in sub-paragraphs (i) to (xiv) and (xvi) |
| | | | | | an open vehicle park or open car park not relating to any project referred to in sub-paragraphs (i) to (xv) |
| | | | (b) | earthworks or site clearance in a tree conservation area or on vacant land, and not relating to any project referred to in paragraph (a) at the time of the application |
|
| | | | For an application under section 32 of the Act (for the Commissioner’s approval for the purposes of section 24, 26, 30 or 31 of the Act) made for the first time at the development control submission stage, for works in any area other than a tree conservation area or on any land other than vacant land, and relating to any project described in item 4(a) |
| | | | For an application under section 32 of the Act (for the Commissioner’s approval for the purposes of section 24, 26, 30 or 31 of the Act) made for the first time at the building plan submission stage, for — |
| | | | | | | | (b) | a pedestrian overhead bridge, link bridge, covered linkway or covered public walkway |
|
| | | | (c) | an underground pedestrian linkway or underpass |
|
| | | | (d) | a promenade or pedestrian mall |
|
| | | | (e) | a new street under section 18 of the Street Works Act (Cap. 320A) |
|
| | | | (f) | an open air parking area at street level within any premises referred to in section 22 of the Act |
|
| | | | (g) | a project other than one referred to in paragraphs (a) to (f) |
|
| | | | For an application under section 32 of the Act (for the Commissioner’s approval for the purposes of section 24, 26, 30 or 31 of the Act) made either at the development control submission stage or at the building plan submission stage, relating to a project abutting a category 5 road under a self-declaration scheme, and for — |
| | | | | | | | (b) | works within any building or development |
|
| | |
”. |
|
|