Building Control Act |
Building Control (Buildable Design) Regulations 2000 |
|
Citation and commencement |
1. These Regulations may be cited as the Building Control (Buildable Design) Regulations 2000 and shall come into operation on 1st January 2001. |
Definitions |
2. In these Regulations —
|
Application |
Minimum buildability score |
4. Any person who wishes to commence or carry out, or permit or authorise the commencement or carrying out of, any building works to which these Regulations apply, and every qualified person appointed in respect of the building works under section 6(3) of the Act, shall ensure that the building works are designed to comply and are carried out in accordance with —
|
Submission of buildability score |
5.—(1) Any person for whom any proposed building works are to be commenced or carried out shall, at the time of the application for approval of building plans under section 6(1) of the Act, submit the buildability score to the Commissioner of Building Control.
|
Submission of structural buildability score |
6.—(1) In addition to the requirements in regulation 5, if an application for approval of detailed structural plans of any proposed building works under section 6(1) of the Act is made before an application for approval of the building plans, then the person making the application shall, at the time of application for approval of detailed structural plans of the building works, submit the buildability score relating to the structural elements of the building works (referred to in this regulation as the structural buildability score) to the Commissioner of Building Control.
|
Departure and deviation from approved plans |
7. Any person who wishes to depart or deviate from any plan of building works approved by the Commissioner of Building Control under section 6(2)(a) of the Act shall ensure that the departure or deviation is designed to comply, and is carried out in accordance, with the minimum buildability score as required under regulation 4. |
Submission of as-built buildability score |
8.—(1) On completion of the building works, the person for whom the building works were carried out shall, within one month of obtaining a temporary occupation permit and in any case before obtaining a certificate of statutory completion, submit the buildability score of the building works as completed (referred to in this regulation as the as-built buildability score) to the Commissioner of Building Control.
|
Penalty |
9. Any person who contravenes or fails to comply with regulation 4, 5, 6, 7 or 8 shall be guilty of an offence and shall be liable on conviction to a fine not exceeding $5,000. |
Permanent Secretary, Ministry of National Development, Singapore. |
[ND 202/1-73 V9; AG/LEG/SL/29/97/1 VOL. 2] |
(To be presented to Parliament under section 52 of the Building Control Act). |