Environmental Pollution Control Act
(Chapter 94A, Section 77(1))
Environmental Pollution Control
(Control of Noise at Construction Sites) Regulations
Rg 2
G.N. No. S 157/1999

REVISED EDITION 2001
(31st January 2001)
[1st April 1999]
Citation
1.  These Regulations may be cited as the Environmental Pollution Control (Control of Noise at Construction Sites) Regulations.
Definition
2.  For the purposes of these Regulations, “construction site” means any premises on or in which works of the following description are being carried out:
(a)the erection, construction, alteration, repair or maintenance of buildings, structures or roads;
(b)the breaking up, opening or boring under any road or adjacent land in connection with the construction, inspection, maintenance or removal of works;
(c)piling, demolition or dredging works; or
(d)any other work of engineering construction.
Permissible noise level
3.—(1)  The owner or occupier of any construction site shall ensure that the level of noise emitted from his construction site does not exceed —
(a)in the case of any construction work which has commenced before 1st October 2007, the maximum permissible noise levels set out in the First Schedule; and
(b)in the case of any construction work commencing on or after 1st October 2007, the maximum permissible noise levels set out in the Second Schedule.
[S 145/2007 wef 01/10/2007]
(1A)  Notwithstanding paragraph (1), the Director-General may, if satisfied that there is justifiable technical reason to do so in any particular case, by notice in writing require the owner or occupier of the construction site —
(a)to ensure that the level of noise emitted from his construction site does not exceed such other maximum permissible noise levels as the Director-General may specify; and
(b)to comply with such other terms and conditions as the Director-General may think fit to impose.
[S 145/2007 wef 01/10/2007]
(2)  For the purposes of paragraph (1), noise level readings shall be taken —
(a)one metre away from the outside of any affected building regardless of the distance between the affected building and the boundary of the construction site; or
(b)if a suitable location cannot be found one metre away from the outside of any affected building, at such other location as the Director-General may specify.
[S 145/2007 wef 01/10/2007]
(3)  If there are other sources of noise affecting the measurement of the level of noise emitted from a construction site, the maximum permissible noise levels set out in the First and Second Schedules shall be adjusted in accordance with the Third Schedule and the adjusted value shall be taken as the maximum permissible noise level.
(4)  Paragraph (b) of Parts I and II of the Second Schedule shall not apply to any construction site in which the following works are carried out:
(a)repair and maintenance work to public roads; and
(b)repair work to any sewer, drain, water, gas or electricity line.
[S 276, wef 01/10/2001]
(5)  For the purposes of these Regulations, construction work shall be deemed to have commenced on the date specified in a permit to carry out building works in that construction site granted by the Commissioner of Building Control under section 7 of the Building Control Act (Cap. 29).
[S 276, wef 01/10/2001]
Equipment to measure and record noise level to be set up
4.  The Director-General may, by notice in writing, require the owner or occupier of any construction site —
(a)to set up equipment to measure and record the level of noise emitted from his construction site over such duration as may be directed by the Director-General; and
(b)to submit the records of the noise level readings, including all relevant facts which may influence the values of the noise level readings.
[S 145/2007 wef 01/10/2007]
Penalty
5.  Any person who fails to comply with regulation 3(1) or any notice issued by the Director-General under regulation 3(1A) or 4 shall be guilty of an offence and shall be liable on conviction to a fine not exceeding $40,000 and, in the case of a continuing offence, to a further fine not exceeding $1,000 for every day or part thereof during which the offence continues after conviction.
[S 145/2007 wef 01/10/2007]