PART II Procedure leading to award of procurement contract |
Notice of intended procurement |
10.—(1) For each procurement, a contracting authority shall publish a notice of intended procurement in an approved medium, except in the circumstances described in regulation 26.(2) Except as otherwise provided in these Regulations, a notice of intended procurement by a contracting authority shall contain the following information:(a) | the name and address of the contracting authority and other information necessary to contact the contracting authority and obtain all relevant documents relating to the procurement, and the cost of and terms of payment for such documents, if any; | (b) | a description of the procurement, including the nature and quantity of the goods or services to be procured or, where the quantity is not known, the estimated quantity; | (c) | in the case of a recurring contract, an estimate, where possible, of the timing of subsequent notices of intended procurement; | (d) | a description of options, where applicable; | (e) | the date of delivery of the goods, the date of performance of the service, or the duration of the contract; | (f) | the procurement method that will be used and whether it will involve negotiation or electronic auction; | (g) | where applicable, the address and any final date for the submission of requests for participation in the procurement; | (h) | the address and the final date for the submission of tenders; | (i) | the language in which a request for participation or tender is to be submitted; | (j) | a list and brief description of the conditions for participation of suppliers, including any requirements for specific documents or certifications to be provided by suppliers in connection therewith, unless such requirements are included in the tender documentation that is made available to all interested suppliers at the same time as the notice of intended procurement; | (k) | where, pursuant to regulation 14, a contracting authority intends to select a limited number of qualified suppliers to be invited to tender, the criteria that will be used to select them and, where applicable, any limitation on the number of suppliers that will be permitted to tender; and | (l) | a statement that the procurement is covered by the Agreement on Government Procurement. |
|
|
11.—(1) For each procurement, a contracting authority shall publish a summary notice that is readily accessible, at the same time as the publication of the notice of intended procurement.(2) A summary notice shall contain the following information:(a) | the subject‑matter of the procurement; | (b) | the final date for the submission of tenders or, where applicable, any final date for the submission of requests for participation in the procurement or for inclusion on a multi‑use list; and | (c) | the address from which documents relating to the procurement may be requested. |
|
|
Notice of planned procurement |
12.—(1) A contracting authority may publish in the approved medium as early as possible in each financial year of the contracting authority, a notice of planned procurement.(2) The notice of planned procurement referred to in paragraph (1) shall include the subject‑matter of the procurement and the planned date of the publication of the notice of intended procurement. |
(3) A contracting authority listed in Part II of the Second Schedule to the Order may use a notice of planned procurement as a notice of intended procurement if the notice of planned procurement includes as much of the information referred to in regulation 10(2) as is available to the contracting authority and a statement that interested suppliers should express their interest in the procurement to the contracting authority. |
|
Conditions for participation |
13.—(1) A contracting authority shall limit conditions for participation of suppliers in a procurement to those that are essential to ensure that a supplier has the legal and financial capacities and the commercial and technical abilities to undertake the procurement.(2) In establishing the conditions for participation of suppliers in a procurement, a contracting authority —(a) | shall not impose the condition that, in order for a supplier to participate in a procurement, the supplier must have been previously awarded one or more contracts by any contracting authority; and | (b) | may impose the condition that a supplier is to have relevant prior experience where such experience is essential to meet the requirements of the procurement. |
|
(3) In assessing whether a supplier satisfies the conditions for participation of suppliers in a procurement, a contracting authority —(a) | shall evaluate the financial capacities and the commercial and technical abilities of a supplier on the basis of that supplier's business activities regardless whether the activities are inside or outside Singapore; and | (b) | shall base its evaluation on those conditions of participation that the contracting authority has specified in advance in the notice of intended procurement or tender documentation related to the procurement. |
|
(4) A contracting authority may exclude a supplier from participation in a procurement, or treat the supplier as ineligible to tender for the procurement, or refuse to short‑list the supplier for the procurement, on any of the following grounds:(a) | the supplier, being an individual, is bankrupt or has made any composition or arrangement for the benefit of his creditors; | (b) | the supplier, being a company, has passed a resolution or is the subject of an order by a court for the company’s winding up otherwise than for the purposes of bona fide reconstruction or amalgamation, or has had a receiver, manager or administrator on behalf of a creditor appointed in respect of the company’s business or any part thereof; | (c) | the supplier has furnished any false information or document to the contracting authority; | (d) | the supplier has committed significant or persistent breaches in the performance of any substantive requirement or obligation under any contract with any contracting authority; | (e) | the supplier has been convicted of any offence involving fraud, dishonesty or moral turpitude; | (f) | the supplier has committed professional misconduct or acts or omissions that adversely reflect on the commercial integrity of the supplier; | (g) | the supplier has failed to pay taxes under any written law; | (h) | any other ground for the debarment of suppliers published in an approved medium. |
|
|
Registration system and qualification procedure |
14.—(1) A contracting authority may maintain a supplier registration system requiring interested suppliers to register and provide certain information.(2) A contracting authority shall not adopt or apply any registration system or qualification procedure with the purpose or the effect of creating unnecessary obstacles to the participation of suppliers in its procurement. |
|
15.—(1) Subject to paragraph (3), a contracting authority may maintain a multi‑use list of suppliers, provided that a notice inviting interested suppliers to apply for inclusion on the multi‑use list is —(a) | published annually; and | (b) | where published by electronic means, made available continuously. |
(2) The notice referred to in paragraph (1) shall include the following information:(a) | a description of the goods or services, or categories thereof, for which the multi‑use list may be used; | (b) | the conditions for participation to be satisfied by suppliers for inclusion on the multi‑use list and the methods that the contracting authority will use to verify that a supplier satisfies the conditions; | (c) | the name and address of the contracting authority and other information necessary to contact the contracting authority and obtain all relevant documents relating to the multi‑use list; | (d) | the period of validity of the multi‑use list and the means for its renewal or termination, or where the period of validity is not provided, an indication of the method by which notice will be given of the termination of use of the multi‑use list; and | (e) | a statement that the multi‑use list may be used for procurements to which these Regulations apply. |
|
(3) In the case of a multi‑use list with a validity period of 3 years or less, the contracting authority may publish the notice referred to in paragraph (1) only once at the beginning of the period of validity of the multi‑use list, if —(a) | the notice states —(i) | the validity period of the multi‑use list; and | (ii) | that no further notice referred to in paragraph (1) will be published; and |
| (b) | the notice is published by electronic means and is made available continuously during the validity period of the multi‑use list. |
|
(4) A contracting authority shall allow suppliers to apply at any time during the validity period of the multi‑use list for inclusion on a multi‑use list and shall include on the multi‑use list all qualified suppliers within a reasonably short time. |
(5) Where a supplier that is not included on a multi‑use list submits a request for participation in a procurement based on a multi‑use list and all required documents, within the time period provided for in regulation 22(1), a contracting authority —(a) | shall examine the request; and | (b) | shall not exclude the supplier from consideration in respect of the procurement on the grounds that the contracting authority has insufficient time to examine the request, unless, in exceptional cases, due to the complexity of the procurement, the contracting authority is unable to complete the examination of the request within the time period allowed for the submission of tenders. |
|
|
Multi-use list by certain contracting authorities |
16.—(1) A contracting authority listed in Part II of the Second Schedule to the Order may use a notice inviting suppliers to apply for inclusion on a multi‑use list as a notice of intended procurement, if —(a) | the notice is published in accordance with regulation 15(1) (read with regulation 15(3)) and includes the information required under regulation 15(2), as much of the information required under regulation 10(2) as is available and a statement that it constitutes a notice of intended procurement or that only the suppliers on the multi‑use list will receive further notices of procurement covered by the multi‑use list; and | (b) | the contracting authority promptly provides to suppliers that have expressed an interest in a given procurement to the contracting authority, sufficient information to permit them to assess their interest in the procurement, including all remaining information required under regulation 10(2), to the extent that such information is available. |
(2) A contracting authority listed in Part II of the Second Schedule to the Order may allow a supplier that has applied for inclusion on a multi‑use list in accordance with regulation 15(4) to tender in a given procurement, where there is sufficient time for the contracting authority to examine whether the supplier satisfies the conditions for participation. |
|
Information on contracting authority’s decision |
17.—(1) A contracting authority shall promptly inform any supplier that submits a request for participation in a procurement or application for inclusion on a multi‑use list of the contracting authority's decision with respect to the request or application.(2) Where a contracting authority rejects a supplier's request for participation in a procurement or application for inclusion on a multi‑use list, ceases to recognise the supplier as qualified, or removes the supplier from a multi‑use list, the contracting authority shall promptly inform the supplier and, on the request of the supplier, promptly provide the supplier with a written explanation of the reasons for its decision. |
|
18.—(1) A contracting authority shall not prepare, adopt or apply any technical specification or prescribe any conformity assessment procedure with a view to, or with the effect of, avoiding the application of these Regulations.(2) Technical specifications issued by a contracting authority shall, where appropriate —(a) | be in terms of performance and functional requirements rather than design or descriptive characteristics; and | (b) | be based on the applicable international standard or, if no such standard exists, on the applicable standard in Singapore. |
|
(3) Where design or descriptive characteristics are used in the technical specifications, a contracting authority should indicate, where appropriate, that it will consider tenders of equivalent goods or services that demonstrably fulfil the requirements of the procurement by including words such as “or equivalent” in the tender documentation. |
(4) The technical specifications shall not refer —(a) | to any goods ―(i) | bearing a particular trade mark or trade name; | (ii) | using a particular patent, copyright, design or type; | (iii) | produced by a particular producer; | (iv) | supplied by a particular supplier; or | (v) | originating from a particular place; or |
| (b) | to any service —(i) | bearing a particular trade mark or trade name; or | (ii) | supplied by a particular supplier or a supplier from a particular place, |
|
unless the requirements of the procurement cannot be described in a manner that is sufficiently precise or intelligible, in which case the reference shall be accompanied by the words “or equivalent”. |
|
(5) A contracting authority shall not seek or accept, in a manner which will have the effect of precluding competition, advice which may be used in preparing technical specifications for a procurement, from a person who has or who is likely to have a commercial interest in the procurement. |
(6) A contracting authority may, in accordance with this regulation, prepare, adopt or apply technical specifications to promote the conservation of natural resources or protect the environment. |
|
19.—(1) A contracting authority shall make available to suppliers tender documentation which contain such information as may be necessary to enable them to prepare and submit responsive tenders.(2) Unless already provided for in the notice of intended procurement, the information referred to in paragraph (1) shall include —(a) | the procurement, including the nature and quantity of the goods or services to be procured or, where the quantity is not known, the estimated quantity and any requirements to be fulfilled, including any technical specifications, conformity assessment certification, plans, drawings or instructional materials; | (b) | any conditions for participation of suppliers, including a list of information and documents that suppliers are required to submit in connection with the conditions for participation; | (c) | all evaluation criteria the contracting authority will apply in the awarding of the contract, and, except where price is the sole criterion, the relative importance of such criteria; | (d) | where the contracting authority will conduct the procurement by electronic means, any authentication and encryption requirements or other requirements related to the submission of information by electronic means; | (e) | where the contracting authority will hold an electronic auction, the rules, including identification of the elements of the tender related to the evaluation criteria, on which the auction will be conducted; | (f) | where there will be a public opening of tenders, the date, time and place for the opening and, where appropriate, the persons authorised to be present; | (g) | any other terms or conditions, including terms of payment and any limitation on the means by which tenders may be submitted, such as whether on paper or by electronic means; and | (h) | any date for the delivery of goods or the performance of services. |
|
(3) A contracting authority shall, in fixing the date for the delivery of goods or the performance of services, take into account —(a) | the complexity of the procurement; | (b) | the extent of anticipated sub‑contracting; and | (c) | the realistic time required for the production, de‑stocking and transport of goods from the point of supply or for the performance of services, as the case may be. |
|
(4) The evaluation criteria set out in the notice of intended procurement or tender documentation may include, price and other cost factors, quality, technical merit, environmental characteristics and terms of delivery. |
(5) A contracting authority shall promptly —(a) | in the case of open tendering, make available tender documentation to ensure that interested suppliers have sufficient time to submit responsive tenders; | (b) | in the case of selective tendering, provide, on request, the tender documentation to any interested supplier; and | (c) | reply to any reasonable request for relevant information by any interested or participating supplier, provided that such information does not give that supplier an advantage over other suppliers. |
|
|
20. Where, prior to the award of a contract, a contracting authority modifies the criteria or requirements set out in the notice of intended procurement or tender documentation provided to participating suppliers, or amends or re‑issues a notice or tender documentation, the contracting authority shall transmit in writing such modifications or amended or re-issued notice or tender documentation —(a) | to all suppliers that are participating at the time of the modification, amendment or re‑issuance, where such suppliers are known to the contracting authority, and in all other cases, in the same manner as the original information was made available; and | (b) | in adequate time to allow such suppliers to modify and re‑submit amended tenders, as appropriate. |
|
21.—(1) A contracting authority shall, unless it is inconsistent with the contracting authority’s reasonable requirements, provide sufficient time period for suppliers to prepare and submit requests for participations and tenders, taking into account —(a) | the nature and complexity of the procurement; | (b) | the extent of anticipated sub‑contracting; and | (c) | the normal time taken for the transmission of tenders by post from foreign as well as local suppliers in the case where electronic means are not used by the contracting authority. |
(2) The time period referred to in paragraph (1), including any extension of the time period, shall be the same for all interested or participating suppliers. |
|
Time period for submission of request for participation and tender |
22.—(1) Subject to paragraphs (2) and (6), where selective tendering is used, the time period for submission of a request for participation shall not be less than 25 days from the date of publication of the notice of intended procurement in an approved medium.(2) Where a state of urgency duly substantiated by the contracting authority renders the time period specified in paragraph (1) impracticable, the time period may be reduced to not less than 10 days. |
(3) Subject to paragraphs (4) to (9), the time period for submission of a tender shall not be less than 40 days from the date on which —(a) | in the case of open tendering, the notice of intended procurement is published in an approved medium; or | (b) | in the case of selective tendering, the suppliers are notified that they will be invited to submit tenders, whether or not a multi‑use list is used. |
|
(4) A contracting authority may reduce the time period for tendering established in accordance with paragraph (3) to not less than 10 days in the case where —(a) | the contracting authority has published a notice of planned procurement referred to in regulation 12(1) at least 40 days but not more than 12 months before the publication of the notice of intended procurement, and the notice of planned procurement contains —(i) | a description of the procurement; | (ii) | the approximate final dates for the submission of tenders or requests for participation; | (iii) | a statement that interested suppliers should express their interest in the procurement to the contracting authority; | (iv) | the address from which documents relating to the procurement may be obtained; and | (v) | as much of the information that is required for the notice of intended procurement under regulation 10(2), as is available; |
| (b) | in the case of recurring contracts, the contracting authority indicates in the initial notice of intended procurement that subsequent notices of intended procurement will provide time periods for tendering based on this paragraph; or | (c) | a state of urgency, duly substantiated by the contracting authority, renders the time period for tendering established in accordance with paragraph (3) impracticable. |
|
(5) A contracting authority may reduce the time period for tendering established in accordance with paragraph (3) by 5 days for each of the following circumstances:(a) | the notice of intended procurement is published by electronic means; | (b) | all the tender documentation are made available by electronic means from the date of the publication of the notice of intended procurement; | (c) | the contracting authority accepts tenders by electronic means. |
|
(6) In the case where paragraphs (4) and (5) apply in respect of an open tendering or a selective tendering, as the case may be, the time period established in accordance with paragraph (3) shall not be less than 10 days from the date on which the notice of intended procurement is published. |
(7) Notwithstanding any other provision in this regulation, where a contracting authority purchases commercial goods or services, or any combination thereof, the contracting authority may reduce the time period for tendering established in accordance with paragraph (3) —(a) | to not less than 13 days if the contracting authority publishes by electronic means, at the same time, both the notice of intended procurement and the tender documentation; or | (b) | to not less than 10 days if the contracting authority accepts tenders for commercial goods or services by electronic means. |
|
(8) Where the contracting authority is a contracting authority listed in Part II of the Second Schedule to the Order, the time period may be fixed by the mutual agreement between the contracting authority and the suppliers. |
(9) The contracting authority referred to in paragraph (8) may, in the absence of an agreement referred to in that paragraph, fix a time period of not less than 10 days. |
|
Division 2 — Open, selective or limited tendering, etc. |
Use of open tendering or selective tendering |
23. Subject to regulation 26, a contracting authority shall only use open tendering or selective tendering in undertaking a procurement. |
24.—(1) Where a contracting authority uses selective tendering, the contracting authority shall —(a) | include in the notice of intended procurement at least the information required in regulation 10(2)(a), (b), (f), (g), (j), (k) and (l) and invite suppliers to submit a request for participation; and | (b) | on or before the date of commencement of the time period for submission of the tender under regulation 22, provide the information required under regulation 10(2)(c), (d), (e), (h) and (i) to the qualified suppliers notified under regulation 22(3)(b). |
(2) A contracting authority shall allow all qualified suppliers to participate in a particular procurement, unless the contracting authority states in the notice of intended procurement of any limitation as to the number of suppliers that will be permitted to tender and the criteria for selecting the limited number of suppliers. |
(3) Where the tender documentation is not made publicly available from the date of publication of the notice referred to in paragraph (1), the contracting authority shall ensure that those documents are made available at the same time to all the qualified suppliers referred to in or selected in accordance with paragraph (2). |
|
25.—(1) A contracting authority may conduct negotiations with any supplier —(a) | if the contracting authority has indicated its intent to conduct negotiations in the notice of intended procurement published under regulation 10(1); or | (b) | if it appears to the contracting authority that no one tender is obviously the most advantageous in terms of the evaluation criteria set out in the notice of intended procurement or tender documentation. |
(2) The contracting authority shall —(a) | ensure that any elimination of suppliers from participating in the negotiations is carried out in accordance with the evaluation criteria set out in the notice of intended procurement or tender documentation; and | (b) | when negotiations are concluded, provide a common deadline for the remaining participating suppliers to submit any new or revised tenders. |
|
|
26.—(1) A contracting authority shall not carry out limited tendering with a view to avoiding competition or protecting suppliers established in Singapore or otherwise in a manner which is discriminatory against any applicable supplier.(2) A contracting authority may only use limited tendering for procurement in any of the following circumstances:(a) | when open tendering or selective tendering was used but no tender was received; | (b) | when the tenders received under open tendering or selective tendering —(i) | are not in compliance with the essential requirements specified in the tender documentation; | (ii) | were submitted by suppliers who failed to comply with the conditions for participation in the tendering procedure; or | (iii) | are collusive; |
| (c) | when the goods or services to be procured can only be supplied by a particular supplier and no reasonable alternative or substitute goods or services exist for any of the following reasons:(i) | the requirement is for a work of art; | (ii) | the protection of patents, copyright or other exclusive rights; | (iii) | the absence of competition for technical reasons; |
| (d) | when the additional goods or services to be procured from the original supplier of goods or services were not included in the initial procurement with the original supplier and a change of supplier for such additional goods or services —(i) | cannot be made for any economic or technical reason such as requirements of interchangeability or interoperability with existing goods, equipment, software, services or installations procured under the initial procurement; and | (ii) | would cause significant inconvenience or substantial duplication of costs for the contracting authority; |
| (e) | when it is strictly necessary, for reasons of extreme urgency brought about by events unforeseeable by the contracting authority, the goods or services cannot be obtained in time by means of open tendering or selective tendering; | (f) | when the goods to be procured are goods on a commodity market; | (g) | when the contracting authority procures a prototype or a first good or service, which is to be manufactured or performed, at the contracting authority’s request, in pursuance of a contract for research, experiment, study or original development; | (h) | when the procurement concerned is subject to exceptionally advantageous conditions which will only apply for a very short period, including any disposal of a non‑routine nature by a person who is not normally a supplier and the disposal of assets of any business in bankruptcy, liquidation or receivership; | (i) | when the contract is to be awarded to the winner of a design contest, being a contest —(i) | organised in a manner which is consistent with the principles of national treatment and non‑discrimination, especially with regard to the publication, in a manner similar to that of a notice of intended procurement, of an invitation to suitably qualified suppliers to participate in the contest; | (ii) | which is judged by an independent panel of judges; and | (iii) | which is organised with a view to awarding the contract to the winner. |
|
|
(3) A contracting authority shall not use limited tendering under the circumstances referred to in paragraph (2)(a), (b) and (c) unless the proposed terms and conditions of the contract are substantially unaltered from the proposed terms and conditions of the contract in relation to which tenders were sought using open tendering or selective tendering. |
(4) Where the contract for research, experiment, study or original development referred to in paragraph (2)(g) has been completed, any subsequent procurement of the goods or services concerned shall be undertaken using open tendering or selective tendering. |
(5) A contracting authority using limited tendering under paragraph (2) may choose not to apply regulations 10 to 17, 19 to 22, 24, 25, 27, 28 and 29. |
(6) In this regulation —“existing goods” includes any software to the extent that the original procurement of the software is a procurement subject to the Act; |
“original development” includes the limited production or supply of the prototype or first good or service in question for the purposes of incorporating the results of any field test and of demonstrating that the prototype, good or service is suitable for mass‑production or mass‑supply of an acceptable quality standard, but does not include mass‑production or mass‑supply of the prototype, good or service for the purposes of establishing commercial viability or of recovering research and development costs. |
|
|
27. Where a contracting authority conducts a procurement using an electronic auction, the contracting authority shall, before commencing the electronic auction, provide each supplier participating in the electronic auction with —(a) | the automatic evaluation method, including the mathematical formula, that is based on the evaluation criteria set out in the tender documentation and used in the automatic ranking or re-ranking during the electronic auction; | (b) | the results of any initial evaluation of the elements of the supplier’s tender where the contract is to be awarded on the basis of the most advantageous tender; and | (c) | any other relevant information relating to the conduct of the electronic auction. |
|
Receipt, opening and treatment of tenders |
28.—(1) A contracting authority shall receive, open and treat all tenders under the contracting authority’s procedures that ensure fairness and impartiality of the procurement process and the confidentiality of tenders.(2) A supplier whose tender is received after the expiry of the time limit for the submission of tenders, shall not be penalised if the delay is caused solely by mishandling on the part of the contracting authority. |